Published 30.04.2009
Corrugator Scheduling: Slider Functionality Extended
The slider for marking the number of days with medium resp. low priority orders to take into account in Automatic Optimisation now has two additional markers showing the number of days preset for the flute type in question in the Optimisation Parameters.
Moreover, if you change the slider settings to override the Optimisation Parameter settings the system will remember them for 5 minutes.
Published 29.04.2009
Come / Leave at PC-Topp Machine Terminal
The functionality for staff time registration (signing in and out at a machine, changing machines) that used to be accessible only via the classical Machine Terminal has now been added to the PC-Topp Machine Terminal as well.
Published 28.04.2009
Split Order At PC-Topp.NET Multi Machine Terminal
The Split Order functionality that used to be available only in PC-Topp's legacy environment is now available in the Multi Machine Terminal. You can trigger it by partially producing an order.
Published 17.04.2009
Downtime Detection at the Palletizer
The PC-Topp.NET Machine Settings page now supports setting up your palletizer for automatic downtime detection by means of a signal from a sensor.
Published 16.04.2009
Number of Sheets In Available in Converison Machine Scheduling
A new optional column for the number of sheets in per order has been added to the Conversion Machine Scheduling page.
Published 09.04.2009
Order Summary Shows Better View of Linked Orders, Personalized Order Fields
If you open a linked order's Order Summary in PC-Topp.NET now its position in the order web is made clearer and the production status of all orders of the order web is displayed.
Besides personalized order information (order.isc fields) can be fully displayed by double-clicking the personalized order information section.