PC-Topp now gives you close control of the amount of die-cut waste occurred during production at the PC-Topp.NET Machine Terminal.
This optional new feature prompts the user to enter the sheet weight before and after production before allowing him to close an order. From the difference between these two figures you can easily calculate the die-cut waste of this order.
In the production statistics, the die-cut waste appears in the PC-Topp.NET Plant Performance Report.
To enable this feature, some PC-Topp parameters have to be modified so if you want to use it please contact the PC-Topp team.