PC-Topp Internet Neugebauer Rhapso GmbH
Home About Us  News Products Documentation Our Customers Sitemap www.rhapso.com
Products
PC-Topp.NET
- The System
- Characteristics
- Functionalities
Integration of PC-Topp
Modern Scheduling
Corrugator Scheduling
- Automatic Optimisation &
  Interactive Planning
- Program Memory
- Single Knife Scheduling
Conversion Scheduling
- Automatic Optimisation
- Machine Load
- Work in Progress
- Palletizer Monitor
Corrugator Link
- Corrugator Online Link
- Corrugator Control Page
- Corrugator Terminal
- Corrugator Monitor
Shop Floor Data Collection
- Machine Terminal
- Multi Machine Terminal
Conveyor Online Link
Production Statistics
- Production Targets
- Plant Performance Reports
- Customized Statistics
Pallet Labeling
Customers' Opinions
Start-Up, Training, Support
New: Roll Size Optimisation
- How Does RSO Work?
- RSO in Action
- RSO Background Info

Program Memory

Comfortably compile your corrugator schedule

The Program Memory lets the planner put the corrugator runs into the desired sequence. An automatic pre-sort can be refined manually, with control over the minutest detail.

When the right sequence is established, PC-Topp computes the starting time for each run and thus knows the time at which each order comes off the corrugator.

Step by step, the ongoing production slowly replaces these theoretical times by actual times (and fills in the actual meters). If the corrugator loses time (or runs faster than expected), then the predicted starting times for the rest of the schedule are adapted automatically, informing Planning as well as Production in real time.

The Program Memory page offers a well structured view of the program memory which shares the clarity of the corresponding classical program but is more convient to scan. Moreover, the scope of colors for marking production status is extended so that the order information displayed is more differentiated.

In the combinations view, the combinations are color coded as well, highlighting their production status more clearly than in the classical program memory. Additionally the combinations view supplies direct links to order information.


At a Glance
  • Computer-Aided Corrugator Scheduling with Full Manual Control
    The planner keeps control over all details.
  • Real Time Corrugator Production Information
    Automatically calculated starting times are immediately available
    to Planning and Conversion.

PC-Topp.NET Online Test
Free test account for on-line PC-Topp.NET trial version on http://demo.pctopp.com